{"id":1199,"date":"2015-12-10T15:35:41","date_gmt":"2015-12-10T14:35:41","guid":{"rendered":"http:\/\/hausbau.xn--hrtel-gra.org\/?p=1199"},"modified":"2015-12-28T23:15:07","modified_gmt":"2015-12-28T22:15:07","slug":"unterstellung-kragwand-achse-4-schalung-bewehrung-ueberzuege","status":"publish","type":"post","link":"http:\/\/hausbau.xn--hrtel-gra.org\/?p=1199","title":{"rendered":"Unterstellung Kragwand Achse 4, Schalung &#038; Bewehrung \u00dcberz\u00fcge"},"content":{"rendered":"<p>Aufstellen der Unterstellungsr\u00fcstung f\u00fcr die Kragwand in Achse 4.<\/p>\n<p>Fertigstellung der Schalung und Bewehrung der Deckenrand\u00fcberz\u00fcge am Stiegenloch in der EG Decke.<\/p>\n<p>Ziegel OG W\u00e4nde bis letzte Reihe fertiggestellt.<\/p>\n<p><a href=\"http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1251\" src=\"http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828-300x225.jpg\" alt=\"IMG04623-20151210-0828\" width=\"300\" height=\"225\" srcset=\"http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828-300x225.jpg 300w, http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828-1024x768.jpg 1024w, http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828-400x300.jpg 400w, http:\/\/hausbau.xn--hrtel-gra.org\/wp-content\/uploads\/2015\/12\/IMG04623-20151210-0828.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aufstellen der Unterstellungsr\u00fcstung f\u00fcr die Kragwand in Achse 4. Fertigstellung der Schalung und Bewehrung der Deckenrand\u00fcberz\u00fcge am Stiegenloch in der EG Decke. Ziegel OG W\u00e4nde bis letzte Reihe fertiggestellt.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-1199","post","type-post","status-publish","format-standard","hentry","category-bautagebuch"],"_links":{"self":[{"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/posts\/1199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1199"}],"version-history":[{"count":3,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/posts\/1199\/revisions"}],"predecessor-version":[{"id":1252,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=\/wp\/v2\/posts\/1199\/revisions\/1252"}],"wp:attachment":[{"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1199"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/hausbau.xn--hrtel-gra.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}